The normal construction duration of a house is approximately 12-14 months.
It does not necessarily mean that you would always require 12-14 months to construct the house.
There is lot of buffer period provided, so that the common deterrents like labour problems, material non-availability, rains and strikes which actually effect construction in a site, are factored in.
Considering all these factors, it appears that 12-14 months is a very good time under which a customer can expect the house construction to be completed.
In specific cases where the customer requires the house to be constructed in a much faster period of time, it is very much possible.